| |
|
|
I am interested to know more
about Patel Neo Town Noida
Please get in touch with me. |
|
|
|
|
| |
| |
| |
| |
| |
| |
|
| Overview |
| Overview |
|
Patel launches one of the benchmark project neo city at noida extension. It will consist 2 & 3BHK premium flats with innovative project layout and good flat layout. Possession of the 1st phase will be in 24 months.
|
| |
| specifications |
| specifications |
| Structure |
| Structure |
Earthquake resistance RCC frame structure as per Seismic Zone ‐ V with latest formwork technique |
|
| Living / Dining |
| Wall Finish |
OBD paint |
| Flooring |
Vitrified Tiles |
| Ceiling |
OBD paint |
| Fittings |
Wooden / Ply door frame with flush door |
|
| Master Bedroom |
| Wall Finish |
OBD paint |
| Flooring |
Wooden Laminated |
| Ceiling |
OBD paint |
| Fittings |
Wooden / Ply door frame with flush door |
|
| Other Bedroom |
| Wall Finish |
OBD paint |
| Flooring |
Vitrified Tiles |
| Ceiling |
OBD paint |
| Fittings |
Wooden / Ply door frame with flush door |
|
| Kitchen |
| Wall Finish |
Ceramic Tiles 2' above working counter |
|
| Flooring |
|
| Ceiling |
|
| Fittings |
Granite Counter, woodwork below the counter, SS Sink with Drainboard |
|
|
| Toilet (Master Bedroom) |
| Wall Finish |
Ceramic tiles in Dado upto 7' high |
|
| Flooring |
|
| Ceiling |
|
| Fittings |
White sanitaryware with EWC, CP fittings & mirror |
|
|
| Toilet (Other Bedroom) |
| Wall Finish |
Ceramic tiles in Dado upto 7' high |
|
| Flooring |
|
| Ceiling |
|
| Fittings |
White sanitaryware with EWC, CP fittings & mirror |
|
|
| Servant Room / Utility / Study Room |
| Wall Finish |
Ceramic tiles in Dado upto 7' high |
|
| Flooring |
|
| Ceiling |
|
| Fittings |
Wooden / Ply door frame with flush door |
|
|
| External Façade Finish |
| Wall Finish |
Superior Texture Finish waterproof paint |
|
|
| Others |
| Balconies |
Anti Skid Ceramic Tiles, External Paint |
|
| External Door & windows |
Aluminium Powder Coated / UPVC |
|
| Electrical |
Copper wire in PVC conduit with MCB supported circuit with adequate number of power points & lights points in ceiling |
|
| Power Back Up |
2BHK ‐ 2 KVA, 3BHK ‐ 3 KVA, 4BHK ‐ 4 KVA |
|
| Lobbies / corridor |
Terrazzo / Marble Stone flooring, OBD paint with 4' dado at entrance |
|
| Staircase |
Granite Tile flooring upto First Floor, Kota Stone flooring, Dry Distemper paint |
|
| Telephone |
One landline connection having intercom facility, provision for telphone points in Living / Drawing & all bedroom |
|
| TV |
Provision for TV points in Living / Drawing & all bedroom |
|
| Variation in Area |
|
| Security System |
Secured gated community with Intercom, CCTV at Entrance Lobby at Ground Floor |
|
|
|
| Top |
|
| location map |
|
| Top |
|
| site plan |
|
| Top |
|
| floor plan |
|
| Top |
|
| price list |
| 1/5/2010 |
| PATEL ADVANCE JV |
| (NOIDA EXTENSION) PRICE LIST |
| TYPE OF FLAT |
UNIT DESCRIPTION |
SALEABLE AREA (IN SQ.FT.) # |
| Type 3 |
2 BHK + 2 Toilet + Study (Type II) |
1050 |
| Type 4 |
2 BHK + 2 Toilet + Study (Type I) |
1090 |
| Type 5 |
3 BHK + 2 Toilet (Type I) |
1345 |
| Type 6 |
3 BHK + 2 Toilet + Store (Type II) |
1425 |
| Type 7 |
3 BHK + 3 Toilet |
1450 |
| Type 8 |
3 BHK + 3 Toilet + Store |
1630 |
|
| |
| PRICE LIST GH-03, NOIDA EXTENSION* |
| Floor |
CLP |
Flexi rate |
Cash Down |
| Floor - 1 |
2425 |
2285 |
2145 |
| Floor - 2 |
2415 |
2275 |
2135 |
| Floor - 3 |
2405 |
2265 |
2125 |
| Floor - 4 |
2395 |
2255 |
2115 |
| Floor - 5 |
2385 |
2245 |
2105 |
| Floor - 6 |
2375 |
2235 |
2095 |
| Floor - 7 |
2365 |
2225 |
2085 |
| Floor - 8 |
2355 |
2215 |
2075 |
| Floor -9 |
2345 |
2205 |
2065 |
| Floor - 10 |
2335 |
2195 |
2055 |
| Floor - 11 |
2325 |
2185 |
2045 |
| Floor - 12 |
2315 |
2175 |
2035 |
| Floor - 13 |
2305 |
2165 |
2025 |
| Floor - 14 |
2295 |
2155 |
2015 |
| Floor - 15 |
2285 |
2145 |
2005 |
| Additional Charges |
| Type of PLC |
Rate |
|
| Park Facing |
Rs. 40/ sq.ft |
Payable (If applicable) |
| Road Facing |
Rs. 30/ sq.ft |
Payable (If applicable) |
| One Time Lease Rent |
Rs. 75/ sq.ft |
Free |
| Reticulated Gas Supply |
Rs. 15,000 |
Free |
| EEC |
Rs. 40/ sq.ft |
Free |
| FFC |
Rs. 25/ sq.ft |
Free |
| Power Backup ( 1KVA) |
Rs 15,000 |
Free |
| Club Membership |
Rs. 1,00,000 |
Free |
| Open Car Park (01 No) |
Rs. 100,000 |
Free |
| Covered Car Park (Mandatory) |
Rs. 65,000 |
Additional |
| IFMS |
Rs 20 / sq.ft. |
At the time of Possession |
| Dual Meter Charges |
As per prevailing rate |
At the time of Possession |
|
|
* Service tax shall be additional as per actual
** Can be withdrawn at any time
***Validity till 30.05.2010 |
|
| Top |
|
| payment plan |
| PLAN A |
CASH DOWN PLAN |
PERCENTAGE |
| |
On Booking |
10% ( BSP) |
| |
Within 45 days from Bankable |
85%(BSP) |
| |
On Possession |
5% (BSP) |
| |
|
One time lease rent, club membership, IFMS |
|
| PLAN B |
CONSTRUCTION LINKED PLAN |
PERCENTAGE |
| |
On Booking |
10% ( BSP) |
| |
Within 30 days from Bankable |
10% ( BSP) |
| |
On Excavation |
10% ( BSP) |
| |
On Ground Floor Casting |
10% ( BSP) |
| |
On 4th Floor Casting |
10% ( BSP) |
| |
On 8th Floor Casting |
10% ( BSP) |
| |
On 12th Floor Casting |
10% ( BSP) |
| |
On Top Floor Casting |
10% ( BSP) |
| |
On Brick Work & Plaster |
10% ( BSP) |
| |
On start of Finishing work |
5% ( BSP) |
| |
On Possession |
5%+ One time lease rent, club membership, IFMS |
| PLAN C |
FLEXI PAYMENT PLAN |
PERCENTAGE |
| |
On Booking |
10% ( BSP) |
| |
Within 45 days from Bankable |
30% ( BSP) |
| |
On Excavation |
10% ( BSP) |
| |
On Basement Roof Casting |
10% ( BSP) |
| |
On 4th Floor Casting |
10% ( BSP) |
| |
On 8th Floor Casting |
10% ( BSP) |
| |
On 12th Floor Casting |
10% ( BSP) |
| |
On start of Brick Work & Plaster |
5% ( BSP) |
| |
On Possession |
5%+ One time lease rent, club membership, IFMS |
|
| Top |
|
| contact us |
| Goldmine Developers Pvt Ltd |
F-19, Globus D, Block H-1A/5&6, Noida, Uttar Pradesh, India
Phone : +91-120-6451252, +91-120-4323277
Mob : 09999652211,09582888314
E-mail : patel@goldminedevelopers.net |
|